{"product_id":"abb-nktu01-l11-termination-unit-cable","title":"ABB NKTU01-L11 Termination Unit Cable","description":"\u003ch2\u003eABB NKTU01-L11 Termination Unit Cable\u003c\/h2\u003e\n\u003cp\u003eThe \u003cstrong\u003eABB NKTU01-L11\u003c\/strong\u003e, also cataloged as the \u003cstrong\u003eNKTU01\u003c\/strong\u003e Termination Unit Cable, serves as a dedicated harness assembly for termination connectivity within ABB automation and protection system architectures.\u003c\/p\u003e\n\u003ch3\u003eHardware Specifications\u003c\/h3\u003e\n\u003cfigure\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003eParameter\u003c\/th\u003e\n\u003cth\u003eSpecification\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003cth\u003eModel\u003c\/th\u003e\n\u003ctd\u003eNKTU01-L11\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eBrand\u003c\/th\u003e\n\u003ctd\u003eABB\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eOrigin\u003c\/th\u003e\n\u003ctd\u003eSweden\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eWeight\u003c\/th\u003e\n\u003ctd\u003e1.4 lb\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eDimensions\u003c\/th\u003e\n\u003ctd\u003eNot specified\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eOperating Temp\u003c\/th\u003e\n\u003ctd\u003eNot specified\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003ePower Consumption\u003c\/th\u003e\n\u003ctd\u003ePassive cable\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eProduct Type\u003c\/th\u003e\n\u003ctd\u003eTermination Unit Cable\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eFrame Size\u003c\/th\u003e\n\u003ctd\u003eUndefined\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eCustoms Tariff Number\u003c\/th\u003e\n\u003ctd\u003e8544429090\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003ePackage Level 1 Units\u003c\/th\u003e\n\u003ctd\u003e1 EA\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003ePackage Level 1 Gross Weight\u003c\/th\u003e\n\u003ctd\u003e1.4 lb\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eMounting\u003c\/th\u003e\n\u003ctd\u003eRack or termination block integration\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eProfinet \/ EtherNet\/IP Deterministic Networks\u003c\/h3\u003e\n\u003cp\u003eThe termination unit cable integrates into ABB control racks, supporting deterministic Profinet and EtherNet\/IP communication pathways. Its copper conductor design ensures stable signal transfer between field termination blocks and controller modules. Cross-talk suppression is achieved through calibrated conductor spacing, while firmware flash compatibility across ABB Relion and Mark VIe systems ensures seamless integration without reconfiguration.\u003c\/p\u003e\n\u003ch3\u003eFrequently Asked Questions\u003c\/h3\u003e\n\u003cp\u003e\u003cstrong\u003eQ: Can the NKTU01-L11 be field-modified for custom lengths?\u003c\/strong\u003e A: No. It is factory-terminated to preserve impedance and shielding integrity.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQ: Is the cable suitable for hazardous area installations?\u003c\/strong\u003e A: No hazardous area certifications are specified; use only in standard protected enclosures.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQ: How is continuity verified during installation?\u003c\/strong\u003e A: Standard loop testing and shield bonding checks are recommended before energizing.\u003c\/p\u003e\n\u003ch3\u003eField Installation Guidelines\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eRoute termination cables separately from high-voltage conductors to minimize EMI.\u003c\/li\u003e\n\u003cli\u003eMaintain shield bonding at designated termination points; avoid multiple ground references.\u003c\/li\u003e\n\u003cli\u003eVerify connector seating and rack alignment before energizing.\u003c\/li\u003e\n\u003cli\u003eInspect cable integrity prior to commissioning; replace if insulation damage is observed.\u003c\/li\u003e\n\u003cli\u003eFollow ABB rack wiring standards for termination harness assemblies.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"ABB","offers":[{"title":"Default Title","offer_id":44185118146634,"sku":"NKTU01-L11","price":540.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0587\/8569\/3770\/files\/NTKU01_1_e191a82b-354b-4b2b-b9d8-e0af8216ab05.jpg?v=1755583751","url":"https:\/\/www.topbrandsplc.com\/products\/abb-nktu01-l11-termination-unit-cable","provider":"Topbrands PLC Limited","version":"1.0","type":"link"}