{"product_id":"nktu01-l10-abb-termination-unit-cable","title":"NKTU01-L10 |ABB |  Termination Unit Cable","description":"\u003ch2\u003eABB NKTU01-L10 I\/O Module to Termination Unit Cable\u003c\/h2\u003e\n\u003cp\u003eThe \u003cstrong\u003eABB NKTU01-L10\u003c\/strong\u003e, also cataloged as the \u003cstrong\u003eNKTU01-L10\u003c\/strong\u003e Cable, serves as a prefabricated harness assembly for direct connection between I\/O modules and termination units in ABB automation systems.\u003c\/p\u003e\n\u003ch3\u003eHardware Specifications\u003c\/h3\u003e\n\u003cfigure\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003eParameter\u003c\/th\u003e\n\u003cth\u003eSpecification\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003cth\u003eModel\u003c\/th\u003e\n\u003ctd\u003eNKTU01-L10\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eBrand\u003c\/th\u003e\n\u003ctd\u003eABB\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eOrigin\u003c\/th\u003e\n\u003ctd\u003eSweden\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eWeight\u003c\/th\u003e\n\u003ctd\u003e0.91 kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eDimensions\u003c\/th\u003e\n\u003ctd\u003e279.4 mm × 279.4 mm × 83.82 mm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eCable Diameter\u003c\/th\u003e\n\u003ctd\u003e0.08382 mm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eOperating Temp\u003c\/th\u003e\n\u003ctd\u003eNot specified\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eStorage Temp\u003c\/th\u003e\n\u003ctd\u003eNot specified\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eProduct Type\u003c\/th\u003e\n\u003ctd\u003ePrefabricated Cable\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eLength\u003c\/th\u003e\n\u003ctd\u003e10 ft (PVC)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eHS Code\u003c\/th\u003e\n\u003ctd\u003e85444290\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eWEEE Category\u003c\/th\u003e\n\u003ctd\u003eNot in scope\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eSCIP Reference\u003c\/th\u003e\n\u003ctd\u003e15c63fe0-25ea-4f87-af49-0b15f1fcc914\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eApplication\u003c\/th\u003e\n\u003ctd\u003eI\/O module to termination unit connectivity\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eBackplane Bus Communication and I\/O Density Scaling\u003c\/h3\u003e\n\u003cp\u003eThe NKTU01-L10 cable ensures deterministic backplane bus communication by bridging I\/O modules directly to termination units. Its prefabricated PVC construction maintains impedance stability and suppresses cross-talk. The harness supports I\/O density scaling within ABB control racks, ensuring firmware flash compatibility across controller generations without requiring reconfiguration.\u003c\/p\u003e\n\u003ch3\u003eFrequently Asked Questions\u003c\/h3\u003e\n\u003cp\u003e\u003cstrong\u003eQ: Can the NKTU01-L10 be field-modified for custom lengths?\u003c\/strong\u003e A: No. It is factory-terminated to preserve shielding and impedance integrity.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQ: Is the cable suitable for hazardous area installations?\u003c\/strong\u003e A: No hazardous area certifications are specified; use only in standard protected enclosures.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQ: How is continuity verified during installation?\u003c\/strong\u003e A: Standard loop testing and shield bonding checks are recommended before energizing.\u003c\/p\u003e\n\u003ch3\u003eField Installation Guidelines\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eRoute separately from high-voltage conductors to minimize EMI.\u003c\/li\u003e\n\u003cli\u003eMaintain shield bonding at designated termination points; avoid multiple ground references.\u003c\/li\u003e\n\u003cli\u003eVerify connector seating and rack alignment before energizing.\u003c\/li\u003e\n\u003cli\u003eInspect cable integrity prior to commissioning; replace if insulation damage is observed.\u003c\/li\u003e\n\u003cli\u003eFollow ABB rack wiring standards for termination harness assemblies.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"ABB","offers":[{"title":"Default Title","offer_id":44185174409290,"sku":"NKTU01-L10","price":400.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0587\/8569\/3770\/files\/NTKU01_2_06067b3b-2a36-417e-8891-b4d067c6dda9.png?v=1764827061","url":"https:\/\/www.topbrandsplc.com\/products\/nktu01-l10-abb-termination-unit-cable","provider":"Topbrands PLC Limited","version":"1.0","type":"link"}